Before Duikerkloof Mutual, our fictional East London insurer, allowed its claims and operations agents to act in production, its risk committee asked for one page. Not an architecture document, not a vendor assessment: one page that listed what usually goes wrong, and showed for each item that it had been dealt with.
The platform team found that harder than expected. It was easy to list risks. It was much harder to say what evidence would show that a risk had been closed rather than discussed.
An agent is ready for production when each known anti-pattern has been removed and the removal can be shown with evidence a reviewer can open, not when the demo works and the team feels confident.
This part collects the series into that page. The first six parts built the controls: the assist and act boundary (part 1), agent identity (part 2), approval (part 3), observability (part 4), cross-agent trust (part 5) and the data lifecycle (part 6). The ten anti-patterns below are what those controls are for.
The ten anti-patterns
| # | Anti-pattern | Symptom | Consequence | Corrective control | Evidence of closure |
|---|---|---|---|---|---|
| 1 | Unnecessary multi-agent design | Several agents where one agent or a workflow would do; agents passing context to agents | Higher cost, harder debugging, unclear accountability | One agent per separate responsibility; workflows for known paths | A design note justifying each agent; a single-agent baseline tested |
| 2 | Weak retrieval | Answers cite the wrong document or an old version; users see records they should not | Confident wrong actions; data exposure | Curated sources, version filters, permission-aware retrieval | Retrieval evaluation results; an access test with low-privilege users |
| 3 | Unbounded loops | Runs that keep calling tools; repeated retries; agents answering each other | Runaway cost; repeated effects | Step, time, token and spend limits; loop detection; idempotency keys | Limit configuration; a test showing the stop fires |
| 4 | Prompt-only security | "Never do X" lives only in the instructions | One injected instruction away from X | Enforce blocks in identity, gateway and harness | A red-team test where the prompt is bypassed and the action still fails |
| 5 | No observability | Nobody can say why the agent did something last week | Incidents cannot be investigated | Minimum action event; owned signals | A mock incident reconstructed from records alone |
| 6 | Model lock-in | Prompts, tools and evaluations tied to one model's quirks | No exit when price, terms or quality change | Model access through a gateway; evaluations that run on any model | An evaluation run on a second model, with results |
| 7 | Unlimited context | Everything goes into the context window "just in case" | Cost, latency, leakage and distraction | Context budgets; retrieval by need; trimming that keeps evidence | Context size per task type within budget |
| 8 | Autonomy without control | The agent acts with no boundary map, approval tiers or sponsor | Unattributable, unapproved changes | Boundary map, agent identity, approval matrix | Signed boundary map; identity record; approval logs |
| 9 | No failure recovery | A failed step leaves half-done work; no rollback path | Inconsistent records; manual clean-up | Durable state, compensating actions, a tested pause and rollback | A failure-injection test with recovery recorded |
| 10 | Demo-to-production shortcut | The pilot environment, credentials and data become production | Pilot shortcuts become production risks | A production readiness gate with named approvers | A completed gate record before go-live |
Notes on the list
Anti-pattern 1 comes first because it multiplies the others. Anthropic's engineering guidance, Building effective agents (19 December 2024), recommends finding the simplest solution possible and only increasing complexity when needed. CloudNala has argued the same in Add multiple agents only for separate responsibilities.
Anti-patterns 3, 4 and 8 map closely to two items in the OWASP Top 10 for LLM applications (2025). Excessive Agency names excessive functionality, excessive permissions and excessive autonomy as root causes. Unbounded Consumption covers uncontrolled resource use. The same Anthropic guidance notes that agents commonly include stopping conditions, such as a maximum number of iterations, to keep control.
Anti-pattern 4 is the one most often claimed as closed without evidence. The test is simple: assume the prompt has failed. If a crafted input persuades the model to attempt a blocked action, does the identity, gateway or harness still refuse it? The tool gateway is a control point, not a trust boundary explains where the refusal must live.
Anti-pattern 6 is about exit, not loyalty. Using one model well is sensible. Being unable to test another is a risk, because pricing, retention terms and model availability change, as part 6 showed for retention.
Anti-pattern 10 is the most common and the least technical. A demo is not a service and Agentic AI beyond the demo cover what changes between the two.
Six more to watch
The ten rows cover the agent. Six further anti-patterns sit around it, in how teams use AI output and how they organise the work.
| Anti-pattern | Corrective control | Evidence of closure |
|---|---|---|
| AI estimates treated as commitments | An estimate is reviewed against its basis and confidence before anyone quotes it | An estimate record with basis, reviewer and confidence |
| AI summaries treated as verbatim evidence | Wording-sensitive decisions go back to the source text | A summary-to-source check on the record |
| Uncontrolled multiplication of artefacts | One source of truth; derived copies are regenerated, not hand-edited | A lineage list of artefacts and their sources |
| Deterministic authority replaced by probabilistic output | Rules that decide eligibility, limits or payments stay rules | Each decision point mapped to a rule or a model |
| Tool access without an accountable business process | No tool is granted unless a named process owner answers for its use | Tool allowlist linked to process owners |
| Pilots with no production route | Every pilot names its production decision and stopping criterion before it starts | A pilot register with route and stop date |
The first three are release-gate problems for AI-generated work, covered in AI estimates are hypotheses and the rest of Evidence-Driven AI Delivery. Where should AI guardrails live? places the remaining controls across the gateway, the harness, the workflow and independent assurance.
Evidence, not assertion
The final column is the point of the exercise. "We have observability" is an assertion. "Here is last Tuesday's restart, reconstructed from the action event, the approval record and the trace, by someone who was not on call" is evidence. The same discipline applies to every row.
Duikerkloof's one page went to the risk committee with eight rows closed and two open. Anti-pattern 6 was open because evaluations had only run on one model; anti-pattern 9 was open because the rollback for claims payments had not been tested. The committee approved the operations agent for production and held the claims agent until both were closed. That is what a useful review produces: a decision with conditions, not a general approval. The outcome is illustrative.
The series' downloadable agent accountability and forensic readiness checklist (Markdown version) includes these ten rows alongside the controls from parts 1 to 6.
What this means for South Africa
South African organisations often move from a pilot to production with a small team and a tight budget, sometimes with a single engineer holding the pilot's credentials and knowledge. That makes anti-patterns 5, 9 and 10 especially likely. The corrective controls are not expensive. A minimum action event, a tested pause and a one-page readiness gate cost days, not months. They are much cheaper than reconstructing an incident with no records, explaining a security compromise to the Information Regulator, or rebuilding trust with a customer after an agent's mistake. This is general information, not legal advice.
Before production
- Run the ten rows against each agent, with the team that will operate it.
- For each row, attach the evidence, not a statement.
- Record open rows as conditions, with owners and dates.
- Approve per agent, not per platform.
- Re-run the list after any change of model, tool set, identity or boundary.
This is the last part of From Copilot to Governed Operator. Previous: Part 6, Zero retention is not zero governance. All parts are on the series page.
Sources and limits: OWASP and Anthropic guidance were checked on 24 November 2026. The list of anti-patterns and the controls are CloudNala analysis. Duikerkloof Mutual is fictional, and its review outcome is illustrative. Statements about regulatory duties are general information, not legal advice.
How CloudNala can help
CloudNala runs pre-production reviews for agents that will act. We work through the ten anti-patterns with your team, gather the evidence for each, test the hardest ones directly, including bypassing the prompt and failing the rollback, and give your risk committee a one-page decision record with clear conditions.
Work with CloudNala
CloudNala helps organisations move from technology ambition to practical execution across cloud, AI, data, platform engineering and digital services.
Whether you are exploring AI, modernising your cloud environment, building a public-sector digital service, or turning an idea into a working MVP, we can help you shape the roadmap and deliver the next step.
Book an Agent Accountability and Forensic Readiness Assessment or write to us at consult@cloudnala.co.za